Contractor Scope of Work & Request for Bids (RFP)
This document represents the owner's conceptual understanding, proposed workflow, and general intent for the space. It is not cast in stone. Rather than a rigid construction directive, these descriptions and sequences serve as an operational framework to guide your site inspection and estimating process.
While the owner has conducted thorough due diligence to compile and present accurate, realistic, and up-to-date site information and dimensions, it remains the sole responsibility of the contractor to independently inspect the site, field-verify all measurements, and confirm that all existing structural and mechanical conditions are correct prior to submitting a final proposal.
Contractors are expected and encouraged to apply their professional trade expertise, structural judgment, and value engineering. In your bid submission, please specifically detail and outline how you intend to execute each scope item—including your recommended construction methodologies, sequence of operations, structural specifications, and any suggested alternatives that provide superior longevity, structural integrity, or cost efficiency.
311" L × 261" W (~25' 11" × 21' 9"), containing 3 interior walls and an existing staircase.
True rough-sawn 8" oak beams running across the room width (261" span). Joists are non-continuous / split into two spans, requiring a central load-bearing beam line.
Note to Bidders: The schedule below is an example format illustrating the line-item breakdown (itemizing labor and materials per scope item) expected in your proposal. Contractors may present their pricing using their standard company bid document, provided it reflects a comparable level of detail.
| Item | Scope Description | Labor ($) | Material ($) | Total ($) |
|---|---|---|---|---|
| 1.0 | Base: Task 1 (Shoring, Joist Remediation, Demo, Flush Beam/Posts, Basement Footers, Upstairs Room 2) | |||
| 2.0 | Base: Task 2 (Fireplace Area Infill – 82" × 34") | |||
| 3.0 | Base: Task 3 (Kitchen Area Infill – 85" × 38") | |||
| 4.0 | Base: Task 4 (Stairs to Old Section Infill – 82" × 32") | |||
| 5.0 |
Base: Task 5 (Building Interconnection Doorways) • Sub-item 5a: Hallway Cut-Through & Commercial Door Install: $________ • Sub-item 5b: Upstairs Dual Fire Door Entryways (Unobstructed Passage): $________ |
|||
| 6.0 | Base: Task 6 (Bathroom Window Conversion) | |||
| 7.0 |
Base: Task 7 (Studio to Retail Passageway – 48" Frame/Opening) • Sub-item 7a: Structural Opening, Lintel & Frame Prep: $________ • Sub-item 7b: Fire Door Slab & Hardware Package (Optional/Deferrable): $________ |
|||
| Total Base Bid | $ | $ | $ | |
| Opt A | Optional: 3 Skylights (Install Provided Units, Decking, Step Flashing) | |||
| Opt B | Optional: Concrete Floor Grinding & Prep | |||
| Opt C | Optional: Plumbing Rough-In & Routing Evaluation (Old & New Areas) | |||
| Opt D | Optional: Complete Sheetrock / Drywall & Electrical Trim-Out | |||
Note to Bidders: The fields below represent an example checklist of the administrative details, insurance verifications, estimated milestones, and authorization disclosures required to accompany your bid submission.